[{"data":1,"prerenderedAt":69},["ShallowReactive",2],{"article-cross-works-downtown-masterplan":3},{"documentId":4,"title":5,"slug":6,"pageStyle":7,"thumbnail":7,"featuredImage":8,"seo":7,"socials":7,"newsPublishedDate":11,"createdAt":12,"updatedAt":13,"publishedAt":14,"items":15},"mjc0iwpfmbnb5j1kwp2s6071","Downtown Masterplan","cross-works-downtown-masterplan",null,{"asset":9,"caption":7},{"url":10,"alternativeText":7},"https://res.cloudinary.com/dy8eurn5e/image/upload/v1751471912/XW_Cableniy_Aerial_1_0eeba6c506.jpg","2024-04-23","2025-06-27T12:02:06.731Z","2025-07-03T17:03:33.126Z","2025-07-03T17:03:33.291Z",[16,27,33,59,64],{"__typename":17,"id":18,"title":19,"body":20,"blockAnchorID":7,"button":7,"size":7},"ComponentBlocksTextBlock","1018","Presenting our downtown regeneration masterplan for a brownfield / ex-industrial site in central Tashkent, Uzbekistan, alongside the Salar Canal.",[21],{"type":22,"children":23},"paragraph",[24],{"text":25,"type":26},"Presenting our downtown regeneration masterplan for a brownfield / ex-industrial site in central Tashkent, Uzbekistan, alongside the Salar Canal. We proposed a diverse mix of residential typologies supported by commercial, community and cultural uses, amounting to 325,000 sq/m (3.5m sq/ft) of floor space on a 20 hectare site, with an average height of 8 storeys and a gross FAR of 1.625. The resulting population was approximately 10,000 residents (with approximately 9 sqm of useable open / green space per person), as well as a daily transient population, all catered for by a mix of parking solutions and public transport connectivity.","text",{"__typename":28,"id":29,"image":30,"lightbox":7,"size":7},"ComponentBlocksImageBlock","227",{"asset":31,"caption":7},{"url":32,"alternativeText":7},"https://res.cloudinary.com/dy8eurn5e/image/upload/v1751471960/16_1_0d70a68027.png",{"__typename":17,"id":34,"title":7,"body":35,"blockAnchorID":7,"button":7,"size":7},"1019",[36,40],{"type":22,"children":37},[38],{"text":39,"type":26},"Different quarters of the masterplan were branded as sub-neighbourhoods in their own right, which would also stand as the phasing strategy for the project, each named as : (i) Eastern Mews (ii) Central Park East (iii) Central Park West (iv) Canalside Heights (v) Community Quarter and (vi) The Boulevard. The architectural approach varied from one sub-neighbourhood to another based on land-use mix, estimated cost per sqm, and site context / adjacencies.",{"type":22,"children":41},[42,44,50,52,57],{"text":43,"type":26},"A great effort in a short time frame by the ",{"url":45,"type":46,"children":47},"https://www.linkedin.com/company/crossworksltd/","link",[48],{"text":49,"type":26},"Cross Works",{"text":51,"type":26}," design team (responsible for urban design, architecture and landscape) and visualisation support from ",{"url":53,"type":46,"children":54},"https://www.linkedin.com/in/ACoAAEX3lvEBKZoq1FtSs65p3CFX_ecqwG1ABYQ",[55],{"text":56,"type":26},"SNT visual",{"text":58,"type":26},".",{"__typename":28,"id":60,"image":61,"lightbox":7,"size":7},"228",{"asset":62,"caption":7},{"url":63,"alternativeText":7},"https://res.cloudinary.com/dy8eurn5e/image/upload/v1751471990/XW_Cableniy_Street_Level_Render_Winter_x_ca06f7bfa4.jpg",{"__typename":28,"id":65,"image":66,"lightbox":7,"size":7},"229",{"asset":67,"caption":7},{"url":68,"alternativeText":7},"https://res.cloudinary.com/dy8eurn5e/image/upload/v1751472008/XW_Cableniy_Mid_Level_1_x_814d1a3e2b.jpg",1776771073445]